Residential · Bathrooms
Bathroom Remodeling in New Jersey
Primary suites, hall baths and powder rooms — we rebuild bathrooms from the studs out, with proper waterproofing, clean tile work and fixtures chosen to last.
You get one schedule and one team from demolition through plumbing, tile, glass and the final fixture installation.
NJ HIC Reg. #13VH13917100 · Registered & insured
At a glance
2–4 wks
Typical full bathroom remodel on site
$9.5k+
Starting total, incl. materials
Studs-out
Waterproofing done right
Why choose Dong Sheng
Waterproofing first
Shower systems are built with proper membranes and sloped drains — the part you never see is what keeps a bathroom dry for decades.
Tile that lines up
Large-format porcelain, marble-look walls, recessed niches and linear drains, laid flat and aligned.
Fixtures and vanities, coordinated
Floating or furniture-style vanities, freestanding tubs, frameless glass and heated towel racks, planned with the plumbing rough-in.
What’s included
- Full bathroom remodels and layout changes
- Walk-in and curbless showers with niches and linear drains
- Tub replacement and freestanding tubs
- Vanities, mirrors and lighting
- Floor and wall tile
- Ventilation, heated towel racks and plumbing upgrades
How your project runs
-
Consultation & site visit
We visit, measure, look at existing conditions and talk through goals, budget and timing.
-
Design & written scope
Layout and fixture options, help with tile and vanity selections, and a written labor quote with a material list.
-
Permits & build
We file permits where required, then handle demolition, plumbing, waterproofing, tile, glass and fixtures with regular updates.
-
Final walkthrough
We review every detail with you and close out the punch list before handover.
Project photos & videos
Real photos and videos from our job sites. Open one to enlarge it, then swipe or use the arrows to browse the rest.
Budget & timeline reference
Bathroom refresh (same layout)
Total (incl. materials) $9.5k – $20k
Timeline 1 – 2 weeks
Full bathroom remodel
Total (incl. materials) $20k – $40k
Timeline 2 – 4 weeks
Primary suite or multiple bathrooms
Total (incl. materials) $40k+
Timeline 4 – 8 weeks
Ranges are total project budgets (labor + materials) for planning. Dong Sheng charges for labor only: you buy tile, vanities, fixtures and other materials directly at actual cost, with no markup from us. Final cost depends on layout changes, plumbing scope, tile and fixture selections. Registered & insured New Jersey home improvement contractor · NJ HIC Reg. #13VH13917100
Frequently asked questions
Where we work
- Bergen County
- Essex County
- Passaic County
- Middlesex County
- Mercer County
Related services
Ready for a better bathroom?
Tell us about the space and we will return a scope, budget range and schedule recommendation.



